Dates are wrong on graph view
in progress
J
Jeff Moore
Dates for new notes are incorrect in the graph view. I have a page reference on a daily note (10/29). When I look at the graph for that page, however, it links to 10/28. This seems to be true for older pages linked to older daily notes as well.
The "backlinks" at the bottom of these notes does read the correct date.
In addition, the graph view that shows up for the daily note itself shows the date as one day prior, even though the date is correct at the top of the note.
Log In
Luca Joos
Merged in a post:
links from daily notes off by 1 day in graph view
B
Ben Cappan
on mac app and web, i create an inline link to something from my daily note. Then when I go to that something, in the graph view it shows the backlink as yesterday. If I click the backlink, it navigates to yesterday.
Specs:
TZ - US EST
lang - english
Replication:
- go to your daily note from the calendar - make a note in that as something like "went to @allegros pizza today" where 'allegros' makes an inline link to a note
- click the link to allegros
- open graph view
- observe error where the link from your daily note shows as yesterday
N
Nick Pfennigwerth
Yep, I’m having the same issue on my Mac and iPhone. Seems that the date is always one day behind.
T
Tony Sklark
I thought it was specific to the iPad app which is currently in early access, but today I stumbled into the same issue in MacOS app.
To be more precise: right now one of my notes is linked to 2024-11-12 but its graph view on MacOS shows me 2024-11-11. Backlinks show 2024-11-12 properly.
iPhone app - same behaviour.
This is Toronto time (GMT-4) and it's 11pm when I'm writing this.
michael_v_h
in progress
Thanks for reporting, we'll look into it!
R
Randal Pearce
I have noticed the same issue
Z
Zachary Walker
I was just about to post about the same issue. Thank you!